Any Query? Let's Chat
PLASTIC CABINETS

98mm long Lead Battery Container/Box

Specification:-

  • Color: Black
  • Shape: Rectangle
  • Material: ABS Plastic
  • Size: 47.5 x 47.5 x 98mm(LxWxH)
  • Usages: Battery
Available in Pack Of:

SKU: YZ8503A

MRP Rs. 38.86
Rs. 29.00 (Incl. Tax)
Rs. 24.58 (+18.00% GST extra)
Rs. 24.58 / pack of 1 = Rs. 24.58 per piece
Buy to Get ₹0 off!
₹0 Special Discount Applied
Quantity
Add to Cart

98mm long Lead Battery Container/Box 

The 98mm Long Lead Battery Container/Box in black color is a practical and durable solution for securely housing and protecting your batteries. Designed with robust construction, this battery container ensures the safe storage and transportation of lead-acid batteries, making it ideal for a wide range of applications including automotive, marine, and industrial uses. With a length of 98mm, this container is compatible with a variety of battery sizes, offering versatility and convenience. The black color gives it a sleek and professional appearance, while also providing resistance to dirt and grime. The container is designed with secure locking mechanisms to prevent accidental openings and ensure that the batteries remain safely enclosed. The interior of the container is engineered to provide a snug fit for the batteries, minimizing movement and reducing the risk of damage during transport. Additionally, it features insulation to protect against electrical shorts and to maintain optimal battery performance.

Features:-

  • Made from high-quality materials 
  • Secure Locking Mechanism
  • The black color provides a professional look
Social Links:
Country Of Origin: China Manufactured / Packed / Imported by: ESRDNS PRIVATE LIMITED Jaitpur Extn. Part-1, E-1/103, Badarpur, New Delhi, South Delhi, Delhi, 110044

1

Overall Rating

Customer reviews

Poor built

Cheap plastic, it's not lockable

Simon Peter - Jul 07, 2026
Hi, Try Me
Shop Curated Picks!
emogi
Curating For You...

AI-Powered Suggestions

Recently Viewed Products